Integrating stormwater management is viewed by some as a difficult or needless proposition.... for two primary reasons:
TSA has developed techniques and software tools that significantly reduce the amount of time (fee) required to reliably size and integrate stormwater management into any project.
1. When configuring land uses, apply bioretention layout guidelines:
2. Locate Bioretention Area:
3. Determine the approximate contributing drainage area limits and footprint of the BMP. 4. Measure the drainage area and input into TSA TOOLS. Compare sizing requirements with the BMP footprint. See Example. 5. Revise footprint or grading as required. Move on to the next BMP. 6. Address all drainage on the site. 7. Assume end-of-pipe BMP area for any areas not captured and quantity management Using CAD and TSA TOOLS, each facility can be reliably sized in minutes.
►
§
►
§
§►
►
| |||||||||||||||||||||||||
|